The first ouput from the Ghasha concession is expected to begin in 2025 and will be ramped up to 1.5 billion cubic feet per day before the end of the decade. Christopher Pike/Bloomberg
The first ouput from the Ghasha concession is expected to begin in 2025 and will be ramped up to 1.5 billion cubic feet per day before the end of the decade. Christopher Pike/Bloomberg